A Billion-Dollar Disaster Every 10 Days. Who’s on Your Bench?

The U.S. averaged a billion-dollar disaster every 10 days in 2025. For restoration firms, hiring can’t wait for the storm. How to build a bench that holds up.

By · · 5 min read

Blueprint-style illustration of a spiral storm system ringed by 23 small squares above a city skyline, with an arc linking a crew truck to a damaged building covered by a tarp.
Plate 5. A storm drawn in isobars, ringed by 23 squares: one for each U.S. billion-dollar disaster Climate Central counted in 2025.

The short version

  • Climate Central counted 23 U.S. billion-dollar disasters in 2025, about 10 days apart. In the 1980s, the gap averaged 82 days.
  • In a Crawford survey of its contractor network, 86% of restoration contractors said the labor market was affecting their business, and 73% reported an operational impact.
  • When events come this close together, surge hiring stops working as a strategy. The bench has to be built between storms.

Restoration has always been a business of surges. A storm hits, the phones light up, and everyone scrambles for crews. Then it quiets down, and the extra people go home.

That model assumes there’s a quiet part. The data says it’s disappearing.

How often do billion-dollar disasters strike?

Climate Central, which took over the billion-dollar disaster database after NOAA stopped updating it in 2025, counted 23 U.S. weather and climate disasters with at least $1 billion in damages last year. They caused an estimated $115 billion in damage and 276 deaths. That’s well above the long-term average of nine events and $67.6 billion a year since 1980.

The number that should change how you staff is the time between them. Climate Central reports an average gap of 82 days in the 1980s, 16 days from 2016 to 2025, and 10 days in 2025. That last figure is Climate Central’s own measure: 23 events spread evenly across a year would be about 16 days apart, so read it as a sign of how closely they clustered.

Average days between U.S. billion-dollar disastersFewer days between events means less time to recover, restaff, and redeploy.
1980s82 days
2016 to 202516 days
202510 days

Source: Climate Central, 2025 in Review

Climate Central notes that back-to-back events can strain the resources available to respond and recover. For a restoration firm, that isn’t abstract. It means your crews may still be deployed on one loss when the next one comes in.

The mix matters as well. Severe storms set a record in 2025, with 21 billion-dollar events. A single outbreak can cross several states, which can stretch a firm in several places at once.

Why should Texas firms pay particular attention?

Few states see more of this. NOAA’s Texas summary lists 190 billion-dollar events affecting the state from 1980 through 2024, including 126 severe storms, 16 tropical cyclones, 11 winter storms, and 20 droughts.

Those numbers undercount the human toll, as Climate Central itself points out. The July 2025 flash flooding in the Texas Hill Country was one of the deadliest inland floods in U.S. history, and it didn’t reach the $1 billion threshold. Dollar counts tell you about market demand. They don’t tell you everything about what happened.

Labor is already the constraint

The demand side would be manageable if labor were easy. It isn’t.

A note on those figures: they come from Crawford’s own contractor network, and Insurance Business reports that Crawford didn’t disclose how many contractors responded, so they aren’t a random sample of the industry. Cleanfax’s 2026 benchmarking survey gives useful context from another angle. Margins moved past labor as the top challenge this year, yet labor still scored a 4.55 weighted average, essentially tied in intensity. The two are connected: absorbing labor costs is one reason margins are tight.

The cost data points the same way. Verisk’s reconstruction cost analysis found combined hourly billable labor costs rose 4.69% from July 2025 to July 2026, more than double the 2.05% rise in material costs. Total reconstruction costs rose 3.8% for residential work and 4.1% for commercial.

Cash shapes the bench too. Cleanfax reports that the majority of respondents wait three to eight weeks for insurance payment, and over 18% wait more than eight. There is a hopeful number in the same survey: 52% report annual turnover under 10%, up from 46% in 2025. Holding on to people is possible, and it’s cheaper than replacing them mid-storm.

And restoration competes for the same people as everyone else. In the 2026 AGC and NCCER survey, 74% of contractors with project manager openings and 72% with estimating openings reported difficulty filling them.

The flaw in the surge model

The standard response to all this is more flexibility. R&R magazine reports many contractors are turning to subcontractors and temporary labor to manage retention and labor costs, while noting that it brings challenges in managing multiple contracts and keeping quality consistent.

Flexible labor has a place, especially for mitigation surges. But it can’t do everything. Consider what actually wins and keeps a commercial restoration account:

  • A project manager who can walk a loss with a property manager and be believed
  • An estimator whose scope holds up with the carrier
  • A business development lead who has known the facilities director for years, before the pipe burst
  • A superintendent who can run reconstruction in an occupied building

Those people aren’t available by the hour, and you can’t find them during a catastrophe. Everyone else is calling them too.

The relationships that win the emergency call get built on a sunny Tuesday.

Commercial accounts are a long game. Prax’s founders have worked in this segment: Alix Spratley spent nearly three years as a commercial account manager in restoration and reconstruction at Blackmon Mooring & BMS CAT, and Jessica Walker was a national recruiter there, hiring across 35+ locations.

How do you build a bench between storms?

Separate your core from your surge

Decide which roles have to be permanent: usually project managers, estimators, reconstruction superintendents, and account leaders. Then hire for those ahead of need, in your slow months, when you can be selective. Let surge capacity cover the rest.

Keep a warm list, not a cold one

For each key role, know three people you’d call. Talk with them when you don’t need anything. A recruiter can carry this for you, but someone has to own it.

Cross-train across regions

If storms can hit several places at once, a bench in one branch can’t be its only resource. Give people experience moving between markets before a deployment forces it, and be upfront about how much travel the job involves. As we’ve written, expectation mismatch is the top reason new field hires leave.

Watch cycle time as a staffing metric

Crawford’s contractors said longer job cycle times were the most common operational impact. If yours are slipping, that’s an early signal of a staffing gap. It’s also the kind of thing carriers and property managers notice.

Plan for what deployment does to people

Long stretches away and hard hours wear on anyone. Set rotation rules, plan recovery time, and check in with crews after a big event. Those are the people you’ll need for the next one, and at this pace, the next one isn’t far away.

Hire before the forecast

No one can tell you where the next event lands. The pattern across the past decade is clear enough to plan around, though. If your plan still assumes you’ll hire when the storm comes, let’s talk about your bench while the weather’s good.

Common questions

How often do billion-dollar disasters happen in the U.S.?

Climate Central counted 23 U.S. billion-dollar weather and climate disasters in 2025, and reports an average of 10 days between them. In the 1980s the gap averaged 82 days. The 2025 events caused an estimated $115 billion in damage and 276 deaths. Source: Climate Central.

How is the labor market affecting restoration contractors?

In Crawford’s 2026 Managed Repair Market report, 86% of restoration contractors in its network said the labor market was affecting their business, 73% reported an operational impact, most often longer job cycle times, and 58% were absorbing higher labor costs. Crawford’s network isn’t a random sample of the industry. Source: Crawford & Company.

Which restoration roles should be permanent rather than surge?

In our view, usually project managers, estimators, reconstruction superintendents, and account leaders, because those roles win and keep commercial accounts. Flexible labor still has a place for mitigation surges, though R&R magazine reports it brings challenges in managing multiple contracts and keeping quality consistent. Source: Restoration & Remediation Magazine.

Sources

  1. 2025 in Review: U.S. Billion-Dollar Disasters, Climate Central, January 8, 2026.
  2. Texas Summary, Billion-Dollar Weather and Climate Disasters, NOAA National Centers for Environmental Information, data through 2024.
  3. 2026 Managed Repair Market Report: Restoration Contractors Face Labor and Cost Pressures, Crawford & Company, October 8, 2026.
  4. Reconstruction Costs Show Moderate Shifts, Verisk, July 31, 2026.
  5. Restoration Contractors Absorbing Labor Costs to Hold Prices, Crawford Survey Finds, Insurance Business, October 8, 2026.
  6. The 2026 Restoration Benchmarking Survey Report, Cleanfax, 2026.
  7. The Workforce Crunch: The Struggle to Find and Keep Skilled Labor, Restoration & Remediation Magazine, accessed November 2026.
  8. 2026 Workforce Survey Analysis, Associated General Contractors of America and NCCER, September 2026.

This article is general information, not legal, financial, or employment advice. Statistics are as published by their sources on the dates shown.

Hiring for a role like this?

Tell us about the seat and the team around it. Alix or Jessica will follow up.

Start a search